Overview
Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.
Read the articleAUTHOR
-
Ismahane EL BAHLOUL: IRCA auditor (EMS and SMS), HSE and risk management consultant
INTRODUCTION
The ten-year operating report (to be submitted every ten years) is a study required of certain facilities to enable the Prefect to re-examine and, if necessary, update the conditions of the authorization issued to the operator of a facility under the regulations governing facilities classified for environmental protection (ICPE). The operating report is drawn up by the operator and forwarded to the Prefect.
As of January 7, 2014, this system has been replaced by an obligation to review permit conditions, which means that a review dossier must be drawn up. This change is a consequence of the transposition of Directive no. 2010/75/EU of November 24, 2010 on industrial emissions, known by its acronym IED.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
CAN BE ALSO FOUND IN:
Preparing your reconsideration file
Article included in this offer
"Environment manager"
(
296 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!