5. Building the project management plan
5.1 Applicable documents and tools
The applicable documents and tools are the project's "toolbox". Each contributor will only use tools explicitly identified in the project quality plan.
You'll be referring to organizational procedures: managing a change request, mastering project documentation, mastering records, managing deliverables, managing a customer complaint, and so on.
You will also refer to tools: question/answer sheets, document templates (functional specification, test report, etc.), incident sheets, etc.
It is not necessary to include all the procedures and descriptions of the tools used in the project quality plan. Simply refer to them in the same way as contractual elements.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Building the project management plan
Bibliography
Also in our database
Reference standards
ISO 9001 version 2015 – Quality management system – Requirements.
ISO 10006 version 2017 – Quality management – Guidelines for quality plans.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference