4. Examine different ways of dividing up the project

There are several ways of structuring a project and dividing it into different parts, work packages...

  • WHAT to do: break down the product into sub-assemblies, a document known as the product breakdown structure (PBS);

  • the HOW to do the what: breakdown into elementary tasks, a document known as the work breakdown structure (WBS);

  • the WITH what resources: a breakdown of the resources used, a document known as the resource breakdown structure (RBS);

  • WHO is responsible: organization breakdown structure (OBS).

It is now necessary to examine in greater detail the objectives of each possible form of project division.

4.1 For...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Design and engineering management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Examine different ways of dividing up the project