4. Examine different ways of dividing up the project
There are several ways of structuring a project and dividing it into different parts, work packages...
WHAT to do: break down the product into sub-assemblies, a document known as the product breakdown structure (PBS);
the HOW to do the what: breakdown into elementary tasks, a document known as the work breakdown structure (WBS);
the WITH what resources: a breakdown of the resources used, a document known as the resource breakdown structure (RBS);
WHO is responsible: organization breakdown structure (OBS).
It is now necessary to examine in greater detail the objectives of each possible form of project division.
4.1 For...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Examine different ways of dividing up the project
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference