Action on industrial buildings
Energy Savings Actions in Industry
Quizzed article REF: BE7010 V1
Action on industrial buildings
Energy Savings Actions in Industry

Author : Sylvie RIOU

Publication date: March 10, 2024 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

7. Action on industrial buildings

The industrial building, the envelope in which the industrial production activity takes place, has rarely been studied, since in most branches of industry, the highest energy consumption is due to the production line. Added to this is the profitability of the actions to be taken. In the industrial sector, the payback period is generally no more than 5 years, and it's not uncommon for companies to limit it to 1 year. The profitability of insulating a facade or roof, for example, rarely falls within these limits.

The ground plan must be up to date, as must the network plan (see below).

7.1 The envelope: ensuring airtightness and promoting natural lighting

The characteristics of the buildings will be recorded in order to study their...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Energy resources and storage"

( 200 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us