6. Create different planning formats
6.1 Perform extractions relevant to the project
In order to reserve the appropriate fields within the tool, it is necessary to know which extractions are to be produced, such as extractions to an Excel file to create physical progress curves, time/time curves, or an S-curve which will enable you to visualize, as a function of time, in a superimposed way, the progress of the project in % with the accumulation of the baseline tasks, those committed and the projection at the end of the project.
If, for example, we want to export milestones to Excel to produce a time/time curve, we'll need to reserve a column (i.e. a field) to specify whether or not the line in question is a time/time milestone.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Create different planning formats
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference